21 JANUARY 2014

3009 Post Oak Achieves LEED Platinum



We are excited that one of the galleria’s newest commercial office buildings, located at 3009 Post Oak, is now LEED Platinum Certified. The 20-story, 302,000-sf building employs numerous sustainable building strategies that have helped transform a derelict parking lot into a vibrant, pedestrian-friendly urban site. 3009 Post Oak is the first LEED Platinum office building in the Galleria area and one of only a handful of LEED Platinum buildings in the city.

Some key metrics include:
• 100% of the site’s irrigation is provided from rainwater stored in an underground tank
• The side of the site facing Interstate 610 was planted with dozens of native grasses intended to attract birds and butterflies
• Indoor water use was reduced by 46% over a typical existing building
• 70% of power for the project comes from renewable sources
• 87% of construction waste was recycled
• 38% of all materials used were local-- both manufactured and harvested within 500 miles of Houston
• The building was designed to provide daylight access to 83% of interior spaces, and views to 99% of spaces
• The exterior site lighting was designed for zero light trespass off the property boundary and zero light projected upwards. This contributes to a dark night sky and respects the surrounding residential neighbors
• Energy savings are 26% better than code requirements
• The building includes a dashboard that monitors building and tenant energy use levels
• The high performance curtainwall uses low emitting, double pane glazing with thermally improved mullions 
Older Newer
Comments Comments
Blog post currently doesn't have any comments.